7.1 Resources (7.1.5)
Posted by Integrated Safety Inspection System on 11:13 PM with No comments
7. SUPPORT
7.1 Resources
7.1.5 Monitoring and measuring resources
7.1.5.1 General
The organization shall determine and provide the resources needed to ensure valid and reliable results when monitoring or measuring is used to verify the conformity of products and services to requirements.The organization shall ensure that the resources provided:
- a) are suitable for the specific type of monitoring and measurement activities being undertaken;
- b) are maintained to ensure their continuing fitness for their purpose.
7.1.5.2 Measurement traceability
When measurement traceability is a requirement, or is considered by the organization to be an essential part of providing confidence in the validity of measurement results, measuring equipment shall be:- a) calibrated or verified, or both, at specified intervals, or prior to use, against measurement standards traceable to international or national measurement standards; when no such standards exist, the basis used for calibration or verification shall be retained as documented information;
- b) identified in order to determine their status;
- c) safeguarded from adjustments, damage or deterioration that would invalidate the calibration status and subsequent measurement results.
Cross reference
Clause 4.4.1 (QMS and its processes)
Clause 8.5.1 (Production Control)
0 comments:
Post a Comment